ZSR Vortices Project Team include experienced leaders and skilled labour within the industry who will execute each project from initial design support to completion. Included in our specialized Power capabilities are design engineering, new switchgear and motor control installations, process equipment relocations or alterations.
Our craftspeople are trained to execute routine and emergency maintenance of industrial electrical power systems and equipment. We are prepared to perform new construction, major shutdowns, capital expansion, plant relocations, & contract maintenance services to clients across the nation.
- Main Switchgear Installations
- Motor Control Centres (MCC)
- Industrial Capital Expansion Projects
- Motor Soft Starter Installations
- Motor Wiring & Field Service (AC / DC)
- Bus Duct & Riser Feeder Installations
- Hazardous
Location/Classified Area Wiring
- Variable Frequency Drive Motor Controls (VFD)
- Motor Starter Installations (NEMA & IEC RATED)
- Power Transformer Installation & Replacement | Dry Type and Oil Filled
- Power & Control Wiring for Processing and Manufacturing Lines
- Computer Room Power Wiring Installations
- UPS Battery Back-Up Systems (Uninterruptable Power Supply)
- Generator Installation and Maintenance (Diesel & Natural Gas)
- Generator Automatic Transfer Switch Maintenance (ATS)
- Electric Heat Trace / Freeze Protection Design, Installation, & Maintenance.
- Turnkey Electrical Installations for Commercial, Industrial and Oil & Gas Projects
- Low Voltage Wiring
- Primary and Secondary Wiring (Medium Voltage)
- Substation Installation
- Megger and High-Pot Cable Testing
- Interior Wiring Installations
- Exterior Aerial or Underground Installations
- Utility Power Pole Installation (Wood & Steel Types)
Miscellaneous Maintenance
- Transformer Oil Testing & Analysis
- Fire & Gas Systems
- Assured Grounding Programs
- Generator Maintenance
- Emergency Reconstruction & Restoration
- Power Injection Testing (Circuit Breakers)
- Cable Repair, Alterations, & Relocations
- Switchgear Maintenance (Cleaning, Torque, Lubricating, & Testing)
- Preventive Maintenance Programs for Power and Control.
ZSR Vortices Project Team includes experienced leaders and skilled labour within the industry who will execute each project from initial design to completion. Included in our specialized Power capabilities are design engineering, new switchgear and motor control installations, process equipment relocations or alterations.
Our craftspeople are trained to execute routine and emergency maintenance of industrial electrical power systems and equipment. We are prepared to perform new construction, major shutdowns, capital expansion, plant relocations, & contract maintenance services to clients across the nation.
System Integration
ZSR Vortices provides state of the art process automation and motion control solutions designed to increase productivity of our customers that operate in today's highly competitive business environment. Our diverse background base and years of experience at ZSR Vortices has been achieved by providing process automation solutions to several high profile customers in the Oil & Gas industry.
ZSR Vortices Integration and Process Control works with the leading PLC and SCADA hardware and software applications such as Foxboro, Yokogawa, Siemens, Toshiba, Allen Bradley, Modicon and more. These technologies are implemented in the integration process based on your existing PLC and SCADA technology being used and your specific process control needs.
Our Capabilities Include:
- Design Solutions Support
- Plant Automation & Upgrading
- Plant Maintenance & Repair
- Streamline of Control Systems
- Process Control Integration Solutions
- Automation Integration Solutions
- Total Systems Integration
- Data Collection & Reporting
- Interfaces to Client’s System
Past Electrical and Instrumentation Projects (Partial List)
No.
|
DESCRIPTION OF WORK
|
CLIENT
|
YEAR
|
1.
|
Provision for DED and SITC for FGS Replacement and Upgrade at OGT PCSB
|
TRISYSTEMS ENGINEERING SDN BHD
|
Jan 2015 - Present
|
2.
|
Engineering, Procurement, Construction and Commissioning of KR1 Tank Overfill Protection Project
|
BERKAT HONEYWELL ENGINEERING SDN BHD
|
Oct 2014 – Present
|
3.
|
Procurement, Construction and Commissioning of KR1 and System Rejuvenation Instrument Compressor, K-1101 & K-1102 AB Project
|
BERKAT HONEYWELL ENGINEERING SDN BHD
|
Sept 2014
|
4.
|
Engineering, Procurement, Construction and Commissioning of KR1 F-101 Project
|
BERKAT HONEYWELL ENGINEERING SDN BHD
|
Sept 2014
|
5.
|
Demolition and Installation of 3 Nos of Control Valve at Aux. Boiler CDU at PPTSB
|
SANGGUL EMAS SDN BHD
|
Sept 2014
|
6.
|
Demolish Internal Component K-4001 Panel and Install New FCS at PPTSB
|
AUTOMATION CONTROL SYSTEM SDN BHD
|
Aug 2014
|
7.
|
Procurement, Construction and Commissioning of KR2 Furnace Project – F22801 at PPTSB
|
TRISYSTEMS ENGINEERING SDN BHD
|
Apr 2014
|
8.
|
Manpower Supply for Install 4 Units of New COSMOS Gas Detector at PPTSB
|
INDUSTRIAL MINERVA SDN BHD
|
Mar 2014
|
9.
|
Manpower Supply for Replace Part HIS-VNET of DCS at Control Room at Petronas Ammonia Sdn Bhd
|
YOKOGAWA KONTROL (M) SDN BHD
|
Sept 2013
|
10.
|
Supply Manpower for Dulang-B
|
JM POWER
|
Mar 2013
|
11.
|
Installation of GC and Network Panel at PDH Gebeng
|
YOKOGAWA KONTROL (M) SDN BHD
|
Feb 2013
|
12.
|
Manpower Supply for Booster Compressor Project for Carigali HESS
|
EPIC MUSTHARI SDN BHD
|
Feb 2013
|
13.
|
DCS upgrade at Kemaman Bitumen Company
|
YOKOGAWA KONTROL (M) SDN BHD
|
Feb 2013
|
14.
|
Design, Fabrication, Install, Testing and Commissioning of MRU Panel at OGT, Kerteh.
|
PETRONAS CARIGALI SDN BHD
|
Jan2013
|
15.
|
DCS upgrade at Kemaman Bitumen Company
|
YOKOGAWA KONTROL (M) SDN BHD
|
Jan 2013
|
16.
|
Manpower Supply (DCS System Installation and Wiring Works) for Mini Plant At Kimanis Training Centre, Membakut Sabah.
|
FOXBORO (M) SDN BHD
|
Jan 2013
|
17.
|
Installation Of Nuclear Level Transmitters At PSR-1, PPMSB
|
PPMSB
|
Jan 2013
|
18.
|
Installation of Flame and Gas Detectors at PPTSB
|
PPTSB
|
Dec 2012
|
19.
|
Panel Modification works at DOVECHEM, Kuantan
|
YOKOGAWA KONTROL (M) SDN BHD
|
Nov 2012
|
20.
|
Metering Skid Upgrade at GPP-A
|
EMERSON PROCESS MANAGEMENT SDN BHD
|
Nov 2012
|
21.
|
DCS Installation and Wiring Works At ADTEC, Kemaman.
|
YOKOGAWA KONTROL (M) SDN BHD
|
Oct 2012
|
22.
|
Design, Fabricate, Supply, Install, Testing and Commissioning Mini Plant At Kimanis Training Centre, Membakut Sabah.
|
FOXBORO (M) SDN BHD
|
Oct 2012
|
23.
|
DCS Wiring Modification and termination work at PPTSB.
|
YOKOGAWA KONTROL (M) SDN BHD
|
Sept 2012
|
24.
|
To Replace PD meter to coriolis flow meter at Resak Platform
|
ENDRESS+HAUSER SB
|
Sept 2012
|
25.
|
To Supply, Install, Testing and Commissioning CCTV System at Export Terminal
|
PETRONAS GAS BERHAD
|
Aug 2012
|
26.
|
Installation of Instrument Transmitters at KR-2 PPTSB
|
ENDRESS+HAUSER SDN BHD
|
Aug 2012
|
27.
|
To Perform instrumentation validation
|
SIME DARBY SDN BHD
|
July 2012
|
28.
|
Installation of NIR Analyzer and Local Panel At PP(T)SB.
|
YOKOGAWA KONTROL (M) SDN BHD
|
July 2012
|
29.
|
Supply and Install Shutdown Valves Accessories
|
OFFSHORE AVENUE SDN BHD
|
June 2012
|
30.
|
Manpower Supply For Dulang-B
|
MATCO MALAYSIA
|
June 2012
|
31.
|
U222 NHTU MODIFICATION PROJECT
|
EPIC MUSTHARI SDN BHD
|
May 2012
|
32.
|
Installation of GC and Local Control Panel at GPP-B
|
YOKOGAWA KONTROL (M) SDN BHD
|
May 2012
|
33.
|
Installation of Instrument Transmitters at KR-2 PPTSB
|
ENDRESS+HAUSER SDN BHD
|
Apr 2012
|
34.
|
Relocation of the DCS Marshalling and System Cabinet at INSTEP Batu Rakit
|
YOKOGAWA KONTROL (M) SDN BHD
|
Apr 2012
|
35.
|
Design, Fabricate and Install the Local Panel at INSTEP Batu Rakit
|
YOKOGAWA KONTROL (M) SDN BHD
|
Mar 2012
|
36.
|
EPCC For Demin Water Supply from CUFK to EMSB, Kertih
|
BIJAK AKTIF SDN BHD
|
Mar 2012
|
37.
|
Troubleshoot the CCTV and PIDS System at ET
|
PETRONAS GAS BERHAD
|
Mar 2012
|
38.
|
Design and Fabricate the Test Bench for Talisman Energy Sdn Bhd.
|
EPIC MUSTHARI SDN BHD
|
Feb 2012
|
39.
|
EPCC For Installation of Fire Hydrant at Onshore Gas Terminal, Kertih.
|
EPIC MUSTHARI SDN BHD
|
Feb 2012
|
40.
|
Manpower Supply For OSC Shutdown
|
MATCO MALAYSIA
|
Feb 2012
|
41.
|
Replacement of 6 Nos. of Control Valves at Shell LOBP at Port Dickson.
|
FOXBORO (M) SDN BHD
|
Jan 2012
|
42.
|
Manpower Supply For Dulang-B
|
PETRONAS CARIGALI SDN BHD
|
Jan 2012
|
43.
|
Supply Manpower (Instrument Technicians and Fitters)for Polyplastics Asia Pasific Shutdown
|
YOKOGAWA KONTROL (M) SDN BHD
|
Dec 2012
|
44.
|
To fabricate pipe spool and Install Vortex Meters At CUF Gebeng.
|
EMERSON PROCESS MANAGEMENT (M) SDN BHD
|
Dec 2011
|
45.
|
To Install Radar Level Transmitter At PPT(S)B
|
ENDRESS+HAUSER SDN BHD
|
Nov 2011
|
46.
|
To Supply and Install enclosure for TDL analyser
|
YOKOGAWA KONTROL (M) SDN BHD
|
Nov 2011
|
47.
|
To Supply and Install MOS key
|
YOKOGAWA KONTROL (M) SDN BHD
|
OCT 2011
|
48.
|
To Supply and install RS485 Cable at Petronas INSTEP, Batu Rakit, Terengganu.
|
YOKOGAWA KONTROL (M) SDN BHD
|
OCT 2011
|
49.
|
Installation of 4 Nos. of Gas Detectors at PP(T) SB, Kertih.
|
INDUSTRIAL MINERVA SDN BHD
|
SEPT 2011
|
50.
|
To Supply and Install Eex'e' Junction Box and TDL Analyser at EMSB
|
YOKOGAWA KONTROL (M) SDN BHD
|
SEPT 2011
|
51.
|
Installation of Flow Transmitter at PASB
|
YOKOGAWA KONTROL (M) SDN BHD
|
AUG 2011
|
52.
|
Panel Modification works at DOVECHEM, Kuantan
|
YOKOGAWA KONTROL (M) SDN BHD
|
AUG 2011
|
53.
|
Installation of Vortex Flow Meter, Pressure Transmitter, Pressure Gauge and Bypass line at Sabah Gas Terminal, Kota Kinabalu.
|
FOXBORO (M) SDN BHD
|
JULY 2011
|
54.
|
To Supply, Installation and Commission Magnetic Flow Meter at Polyplastics (M) SDN BHD
|
EMERSON PROCESS MANAGEMENT (M) SDN BHD
|
JUNE 2011
|
55.
|
Supply, Deliver, Install and Testing Two (2) Nos. of Test Bench At Petronas INSTEP Batu Rakit, Kuala Terengganu.
|
YOKOGAWA KONTROL (M) SDN BHD
|
MAY 2011
|
56.
|
S4 Mini- Plant (Fieldbus Foundation Metering Skid) At Petronas INSTEP Batu Rakit, Kuala Terengganu.
|
YOKOGAWA KONTROL (M) SDN BHD
|
MAY 2011
|
57. |
Supply Manpower (Instrument Technicians and Fitters)for EPEMSB Stop Pit Turnaround 2011 |
YOKOGAWA KONTROL (M) SDN BHD |
APRIL 2011 |
58. |
Provision of Office Renovation including LAN network facilities. |
YOKOGAWA KONTROL (M) SDN BHD |
FEB 2011 |
59. |
Provision of Supply, Installation and Commission Magnetic Flow Meter at VINYL CLORIDE (M) SDN BHD |
EMERSON PROCESS MANAGEMENT (M) SDN BHD |
JAN 2011 |